Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/5/2020 - P72

Finance Committee - Agenda - 8/5/2020 - P72

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

WALDRON ENGINEERING & CONSTRUCTION, INC.

To: William Keating, P.E., Project Engineer, Nashua Wastewater Treatment Facility
From: Jeremy P. Smith, P.E., Waldron Engineering & Construction, Inc.
Date: June 26, 2020
Re: Change Order Request Review 018
NWWYTFE Energy Recovery Upgrade Project
Attachments: Methuen Construction PCO-018 Fuel blending skid relocation
Mr. Keating:

Waldron has compiled its review based on review of the Owner’s documentation (design
documents, OEM submittals, submittal reviews, RFI responses, and project notes) and the
Contractor’s documentation (RFI’s, Submittals, Reports, issued Change Orders). Specifically;
Waldron has reviewed the issue of additional work associated with the relocation of the fuel
blending skid.

Summary Review

Original Schedule Schedule Direct Schedule Schedule Claim
Adjustment claim Impact Assessment Recommended
None 10 0 0
Original Cost Cost Adjustment Direct Cost Impact Cost Adjustment
claim Assessment Recommended
None $10,108 $9,633 to $14,450 $6,652

Detailed Review-Base Cost Validity

Methuen has made a claim for the work as required based on RFI responses, submittal reviews
and Field conditions. The claim is based on their work and their subcontractor’s work resulting
from the above. Waldron has reviewed the design documents, OEM submittals, submittal
reviews, and RFI responses regarding this issue. Waldron has relied on vendor quotes, project
cost estimations, historical project data, RS Means, and its own proprietary cost data to review the
cost validity of the work scope.

The relocation of the fuel blending skid was to maintain access to the digester equipment. MC did
need to extend piping and provide on-wall pipe supports. MC was able to remove pipe stanchion
supports that would have been required in the original design. MC was also able to remove
foundations for pipe stanchions.

Overall Waldron concurs with MC’s representation of their costs, but recommends a higher value
be assigned to the deduct.

37 INDUSTRIAL DRIVE §=SUITEG-1 EXETER,NHO3833 (603) 772-7159

WALDRON COM

Page Image