City of Nashua, New Hampshire
7/24/2020
Division of Public Works MEF
SIDEWALK PROGRAM FY2020
EAST HOLLIS STREET
CO1 ADA Improvements
a : . ses Current
Item No. Item Deseription Units Quantites Unit Price Estimate
203.3. |Unclassified Excavation CY 13 $50.00 $643.52
304.3 Crushed Gravel CY 8 $25.00 $189.81
403.12 |Hot Bituminous Pavement, Hand Method TON 0 $200.00 $0.00
608.24 |4" Concrete Sidewalk SY 22 $75.00 $1,666.67
608.26 |6" Concrete Sidewalk SY 6 $100.00 $620.37
608.54 |Detectable Warning Device, Cast Iron, Powder Coated SY 3 $250.00 $750.00
609.01 |Straight Granite Curb LF 206 $60.00 $12,360.00
609.02 {Curved Granite Curb LF 25 $70.00 $1,750.00
609.5 {Reset Granite Curb LF 25 $50.00 $1,250.00
618.6 |Uniformed Officers § 0 $1,800.00 $0.00
618.7 | Flaggers OR 18 $36.00 $648.00
619.1 Maintenance of Traffic U 0 $1,000.00 $0.00
628.1 Sawed Concrete Pavement LF 30 36,00 $180.00
628.2 |Sawed Bituminous Pavement LF 50 $6.00 $300.00
692 Mobilization (5%) U 0 $5,000.00 $0.00
Subtotal= $20,358.37
COI New Items
604.4 | Reconstructing/Adjusting Catch Basins and Drop Inlets LF 3 $500.00 $1,500.00
608.36 |6" Reinforced Concrete Sidewalk sY 26 $130.00 $3,380.00
609.56 |Reset Granite Curb (6" Back Curb} LF 125 $55.00 $6,875.00
646.51 _|Turf Establishment with Mulch, Loam, and Tackifiers SY 225 $35.00 57,875.00
New Items Subtotal= $19,630.00
Contract= $171,759.00
CO-1 Rounded= $40,000.00
Project Total= $211, 759.00
Page 1 of 4
