Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/5/2020 - P28

Finance Committee - Agenda - 8/5/2020 - P28

By dnadmin on Mon, 11/07/2022 - 13:27
Document Date
Fri, 07/31/2020 - 13:23
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/05/2020 - 00:00
Page Number
28
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__080520…

"Mike Renwick

Estimate

Estimate #8648
11/7/2019

|, MA 02048

Fax.508-339-0184 City of Nashua
Atin: Accounts Payable
nNerprises.com PO Box 2019

229 Main St.

Email: mike@scoreboardenterprises.com

Standard Exclusions

Quotes are valid for 60 days

Scoreboards for ail sports - Sound System SolutionsPitertable Scoreboards - Swim :

860-948-8112 Nashua, NH 03064

Standard Exclusions to include: 1 0.00
- SEI requires full access to the site for the duration of the
installation to include but not limited to - Crane Truck, Van,
Trailer, Lift, Concrete Truck and Excavation Equipment access
- SEI is not responsible for finish landscaping around excavated
areas

~ SEL is not responsible for repairs to finish landscaping as a
result of required installation access, however we will work
diligently and closely with the owner to limit any impact to the
area.

- SEI requires power to the base of the structure by others

- SEI is not responsible for removing excavated material from
site - SEI does not provide soil testing required by us to move off
site

- SEI is not responsible for the integrity of the existing structure
or existing power/date feeds.

- SEI will pull through conduits provided by others
-Scoreboard Enterprises, Inc. is not responsible for unforeseen
obstruction while excavating, i.e. rock, ledge, water, and pipe -
additional cost may be incurred as a result of excavation
obstructions to be invoiced separately

-Scoreboard Enterprises, Inc has based the above installation on
normal soil conditions, if abnormal soil conditions are
encountered, additional cost may be incurred as a result of
additional footing design.

-The installation quote is based the scoreboards sizes provided
on this quote, if larger scoreboards are selected it may result in
increased installation costs due to footing & steel requirements.
-Scoreboard Enterprises, Inc has based the above installation
price on our standard Certificate of Insurance, if additional
coverage or wording is required, additional fees will be the
responsibility of the requestor for additional coverage/wording.