DENNIS MIRES, P.A.
ARCHITECTS
THE
IMPAIRMENT PROCEDURE FOR THE
DEMOLITION PROJECT DURING
NORMAL WORK HOURS
1, THIS AREA IB NOT EQUIPPED WITH AN AUTOMATIC THE EXISTING SILENT KNIGHT ZONED
SPRINKLER SYSTEM, THE EXISTING BURLDING FIRE DETECTION @ SIGNALING
AUTOMATIC SPRINKLER SYSTEM SHALL REMAIN SYSTEM IN THIS SPACE SHALL
ACTIVE THROUGHOUT THE REMAIN ACTIVE DURING THE
DEMOLITION PROJECT, (BEE NOTE WS), BEMCLITICN PHAGE, ALL RENOVATED. d
SPACE EXISTING BMOKE DETECTORS,
2, ALL EXISTING FIRE ALARM DEVICES, EQUIPTIENT, HEAT DETECTORS, MANUS
PANELS, HIRING, ETC, SHALL REMAIN IN PLACE STATIONS AND
AND GPERATIONAL NOTIFICATION DEVICES WILL REMAIN
E CURING THE lowe
SPACE
SHUT a ART OF EACH WORK DAT
AND RE-ACTIVATED AT THE END OF EACH WORK
BAY.
RELOCATE EXISTING INITIATING DEVICE AND ITS.
ASSOCIATED CIRCUITRY, MAINTAIN CONTINUITY OF
FIRE ALARM CIRCUIT,
draven BAS
5, TEMPORARILY RELOCATE THE BOSTING :
INDICATING DEVICE FROM THE WALL To BE checked RGA
DEMDLISHED TO THE NEAREST STRUCTURAL ewahe yreter
SOIT AT THE CEILING ABOVE, ae
220190
FIRST FLOOR KEY PLAN FAIP102
SCALE: NTS,