(IMPAIRMENT PROCEDURE FOR THE ‘
DEMOLITION PROJECT DURING
NORMAL WORK HOURS a
u NOT (AN AUTOMATIC. 2
SPRINKLER SYSTEM, THE ExisTMG BUILDING wo
Tic SPRINKLER SYSTEM SHALL REMAIN 3
ACTIVE THROUGHOUT THE OF THE =a
DEMOLITION PROJECT. (SEE NOTE #3) oT Sy
2. ALL BoSTIMG FIRE ALARM j z50f
PANELS, WIRING, ETC. SHALL REMAIN IN PLACE pect
3, WHEN ALTERATIONS ARE DONE TO THE EXISTING S3Bn
FIRE SUPPRIESGION SYSTEM IN THIS. THE o OS 5
EM IN THIS SPACE SHALL DE So &
SHUT DOvN AT THE START GF EACH HORK DAT oa
AND RE-ACTIVATED AT THE END OF EACH Mom SEN oO
oo TENS
4. RELOCATE EXISTING INITIATING DEVICE AND ITS: Ze
ASSOCIATED CIRCUITRY, MAINTAIN CONTINUITY OF £
FIRE ALARM CIRCUIT, =
5. TEMPORARILY RELOCATE THE EXISTING o
BICAT ne BViCe Pony tee WALL TO Be =
THe T
(SIST AT THE CEILING ABOVE,
Hea’ i
STATICHS AND AUDIGYVIBUAL
NOTIFICATION DEVICES WILL REMAIN
ACTIVE DURING THE DEMOLITION
NOT FOR REGULATORY
APPROVAL PERWNTTING.
OR CONSTRUCTION
(099 62-4 were TA RC
7 Union Seer, MANCHESTER, NH
DENNIS MIRES, P.A.
ARCHITECTS
THE
oe atoms Sal Cooree en,
Atetagetrt ch waite a peor
Terman rb det arene eed
TWamirnrutewnary kaye orate bah
ene wicipemsiar cronies
a
x ‘ . cas:
i : ®: scala: aMt=r-or
i J : RA data: sane
eee AF y pares
- = |
BASEMENT KEY PLAN ih jatar _ ; FAIP101
SCALE) NTS.