Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/16/2020 - P72

Finance Committee - Agenda - 9/16/2020 - P72

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

c

ELECTRICAL SPECIFICATIONS

J, THE GENERAL CONDITIONS SHALL BE CONSIDERED AS FORMING A PART OF THESE SPECIFICATIONS AND SHALL BE
CAREFULLY ECAMINED BEFORE PROPOSALS FOR ANY HORK ARE SUBMITTED,

2. THE SCOPE OF HORK SHALL CONSIST OF ALL LABOR, MATERIALS, EQUIPTIENT AND SERVICES REQUIRED TO COMPLETE
‘ALL_WORK INCICATED ON THE DRAWINGS AND IN THESE SPECIFICATIONS. THE HORK SHALL INCLUDE, BUT SHALL HOT BE
LIMITED Te, THE FOLLOPING.

A. MODIFICATIONS TO THE BECONDARY DISTRIBUTION SYSTEM AS INDICATED OH THE DRANINGS,

B, GROUNDING AND BCHDING OF ELECTRICAL SYSTEMS AND EQUIPMENT,

C, WIRING DEVICES (SHITCHES AND RECEPTACLES) COMPLETE WITH ASSOCIATED HALL PLATES,

By POMER HIRING TO HVAC, PLUMBING AND FIRE PROTECTION BOUIFENT OR APPLIANCES,

LIGHTING SYSTEM INCLUDING ALL FIXTURES, LAMPS, SHITCHING, ETC. AS REQUIRED.

F. FIRE ALARM SYSTEM MODIFICATIONS COMPLETE WITH DEVICES AND HifiNG,

G, ALL OTHER SYSTEMS HEREINAFTER SPECIFIED OR AS INDICATED ON THE DRAHINGS,

ALL ELECTRICAL HORK SHALL MEET OR EXCEED THE LATEST REQUIREMENTS OF ALL NA’ STATE, MUNICIPAL AND
OTHER AUTHORITIES HAVING JURIBDICTION OVER ELECTRICAL CONSTRUCTION WORK AHD THE :
AORTA AND Pay rom ALL FEES, INSPECTIONS, AND TESTS, AND COMPLY HITH ALL LAWS, ORDINANCES AND:
AINING TO THIS PORTION OF THE CONTRACT. mm

1 ALL WORK PROVIDED UNDER THIS SPCTION HALL. BE GUARANTEED FOR HE YEAR FROM THE DATE OF ACCEPTANCE OF

5, RRIOR TO PURGIAGING ANY BUIRTINT OR FATERIALS A LIST OF THEM MANUTACTURERS AND "SHOR DRAPHISe”
CATALOG CUTS SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL.

7, ALL BRANCH AND MAIN FEEDERS RUN IN EXPOBED AREAS SHALL BE RUN IN EMT RACEHAYS, COORDINATE ANY
EXPOSED WIRING ATH POR APPROVAL PRIOR TO ROUGH. BRANCH CIRCUNTRY RUN ABOVE SUSPENDED CEILINGS

8. ALL HIRING SHALL BE COPPER HITH 600¥ INSULAT! THAN OR THHN FOR BRANCH CIRCLITRY,
Op STRANDED COMRUCTORS FOR HI Wolo Wid Arts: USE STRANDED

9, THE ELECTRICAL CONTRACTOR SHALL PROVIDE OUTLET, JUNCTION AND PULL BOKES AT ALL LOCATIONS HHERE THEY ARE
REGUIRED TO FACILITATE THE PULLING, SUPPORTING, OR CONNECTING OF WIRES AND CABLES,

fo. STACARD QUT: CONVENES: RECA TAC ES SAL BE 2 OOS Lee, SIO TYPE BACK § SIDE HIRED,
HEA WHITE IN COLOR. STANDARD SHITCHES BHALL BE CEE, D ER S04 WSVPETTY, SPEC
GRADE IN COLOR. PROVIDE WHITE PLASTIC WALLPLATES WITH ALL

IL ALL BRUIPMENT AND SYSTEMG SHALL DE GROUNDED IN ACCORDANCE WITH BEST INDUSTRY PRACTICE AND SHALL
COMPLY WITH 20°7 NATIONAL ELECTRICAL CODE REQUIREMENTS,

2, BEFORE AN APPLICATION FOR FINAL ACCEPTANCE OF THE WORK, ALL. TRETO DEATED HECESGART BY THE ARCHITECT TO
SHOW PROPER EXECUTION OF THE HORK SHALL HAVE BEEN PERFORMED AND COMPLETED IH THE PRESENCE OF
SRGUTECT. ANY DEFECTS OR DEFINES DISCOVERED TM ANY OF THE ELECTRIC ORK SHALL BE CORRECTED.

AS PART OF THE ELECTRICAL A COMPLETE BET OF RECORD ELECTRICAL DRAWINGS BHALL BE MADE UP AND.
DELIVERED TO THE ARCHITECT, THE SHALL BE PREPARED ON AUTOCAD AND SUBMITTED ON DISK AND ONE GET
OF REPRODUCIBLE PLOTS AT THE COMPLETION OF THE PROJECT,

(4. SUPPORT AND FASTEN ELECTRICAL WORK IN ACCORDANCE WITH BEST INDUSTRY PRACTICE.

fS, ALL ELECTRICAL CONDUIT SHALL BE RUN CONCEALED WHEREVER POSSIBLE, RUN EXPOSED CONGUIT PERPENDICULAR OR
PARALLEL TO BUILDING HALLS OR COLUFINS.

la, ACERT ROURE MODIFIED BY A SPECIFIC NOTATION TO THE CONTRARY, IT SHALL BE UNDERSTOOD TWAT THE INDICATION

‘OF ANY ELECTRICAL ITEM IN THE DRAWINGS OR SPECIFICATIONS FOR ELECTRICAL WORK CARRIES WITH
Fr oTHe INDTRUCTION TO FURNIDIL INDTALL AND CONNECT THE ITEM A® PART OF THE ELECTRICAL MORK REGARDLESS. OF
RHETHER OR MOT IT IS SPECIMCALLT STATED TO DO SO.

or UNDERSTOOD THAT THE SPECIFICATIONS AND. ELECTRICAL WORK pARY AND
ARE TO BE TAKEN TOGETHER A COMPLETE INTERPRETATION OF THE ELECTRICAL WORK, EXCEPT THAT INDICATIONS ON
WHICH REFER ‘TO AN INDIVIDUAL ELEMENTS OF PRECEDENCE ‘THE SPECIFICATIONS HHERE

it. THE ELECTRICAL CONTRACTOR SHALL BE PERMITTED TO INSPECT THE CONDITIONS AT THE If HE/SHE 80 DESIRES.
FAILURE TO INSPECT EXISTING CONDITIONS OR TO FULLY UNDERSTAND THE ORK WHICH IS SHALL NOT EXCUSE
THE ELECTRICAL CONTRACTOR FROM WIB/HER OBLIGATIONS TO FURNISH AND INSTALL THE WORK IN ACCORDANCE WITH THESE
SPECIFICATIONS AND THE CONTRACT DRAMINGS AND UNDER ALL INTE CONDITIONS AS THEY BasT.

IN SPACES WITHIN SUSPENOED CEILINGS UTILIZED AS RETURN AIR PLEHUMS, ALL HIRING SYSTEMS MUST EITHER BE RUN
IN METALLIC RACEHAYS Of SHALL BE UL APPROVED FIRE RATED PLENUM CABLE.

20. ALL MATERIALS SHALL BE HEH ANG SHALL BEAR THE UL LABEL,

21. THE INSULATION OF ACH WIRE OF CABLE SHALL BIE COLOR CODED, AS PER THE 120/208 OR 27T/4BOV 2OIT HATIONAL
ELECTRIC CODE REQUIREMENTS.

22. MOB DISTRIBUTION SHITCHES SHALL BE NEMA TYPE HEAVY DUTT (GENERAL DUTT HERE 604 OR LEGG) HORSEPOWER
RATED SHITCHES.

#8, THE HVAC CONTRACTOR SHALL PROVIDE MAGNETIC MOTOR STARTERS WHERE INDICATED FOR MECHANICAL BOUIPMENT,
PROVIDE AUKILIART CONTACTS IN MOTOR STARTERS WHERE REQUIRED FOR INTERLOCKING PURPOSES,

24. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, PATCHING OR CORUNG OF HALL AND FLOOR
SURFACES REQUIRED FOR THE INSTALLATION OF ANY ELECTHICAL HOR,

DE A TEMPORARY LIGHTING AND POWER SYSTEM THROUGHOUT THE BRACE FOR USE DURUNG THE
Panico. Use THE DosTie TANELBOARoS fon THE TEMPORARY PEED POT. PROVIDE ALL EQUIPMENT THAT MAY BE

ON OF THE CONSTRUCTION PERIOD, THE GINERAL CONTRACTOR SHALL’ PAY POR ALL ENERAT CONBUTED
TERPENATION OF THE . THE GENERAL CONTRACTOR BHALL PAT POR ALL ENERGY CONSUMED DURING
THE CONSTRUCTION PERIOD.

ARSENAL CONTRACTOR SHALL X-RAY THE SLAB BEFORE CUTTING OR CORIG ANY IKISTING CONCRETE SLABS OR

27. THE ELECTRICAL CONTRACTOR SHALL BE RESPOHMBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING

ELECTRICAL MORK IN THE DESIGNATED RENOVATED AREAS UNLESS SPECIFICALLY NOTED OTHERWISE, COORDINATE ALL (TEMS
‘Te BE DEMOLISHED RITH THE ARCHITECT BEFORE COMMENCING WORK.

2B, OUTLETS OR DEVICES MOUNTED CH BOSTING C.n.U. HALLS SHALL BE SURFACE MOUNTED IN APPROPRIATE BOXES.

24, THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND RE-INSTALLING ALL EXISTING CEILING TILES
REQUIRED FOR THE ELECTRICAL CONTRACTOR TO PERFORM HISVHER MORK.

30. ALL DRY TYPE TRANSFORMERS SHALL BE VENTILATED TYPE AND SHALL BE TP-1 RATED.

al, Ji HURNG DEVICES SHALL HAVE THEIR, PANELEGARD ORGM AND CINCIT MUMBERS STAMPED OR TAPED ON THE
BACKSIDE OF THEIR ASSOCIATED WALLPLA

32. PANELBOARDS BHALL BE OF BOLT-ON CONSTRUCTION WITH EQUIPTTENT GROUND BAR AND TYPED CIRCUIT DIRECTORIES,
BB, ALL MEH FIRE ALARM DEVICES SHALL BE AB MANUFACTURED BY THE OSTING FIRE ALARM MANUFACTURER.

BM, THE ELECTRICAL CONTRACTOR SHALL DE RESPOHSIDLE POR TESTING THE FIRE ALARM SYSTEM AT THE COrPLETION OF
THE HORK TO THE SATISFACTION Of THE NASHUA FIRE DEPARTMENT OR THE LOCAL AUTHORITY HAVING JURISDICTICN,

LIGHT FIXTURE SCHEDULE

LIGHT FIXTURE SCHEDULE NOTES

1c THE FLECTRICAL CONTRACTOR BHALL FURNISH AND INSTALL
POUNTING

* oe AGAINST
REFLECTED CEILING PLANS, ELEVATIONS AND DETAIL
DRARINGS,

“3, SERIES FIXTURES SHALL BE LENGTH AS SHOWN ON DRAWINGS,

HORN ONCE ON_A CONTINUOUS ROH OF
Feclumee SILL pe ryPica. Fon THAT Row OME

5, ALL FOCTURES SHALL BE SUPPORTED FROM THE BUILDING
STRUCTURE, INDEPENDENT OF HUNG CEILING.

TALL LO CTU GALL Bi SARE BATH EARLE
0-10 DRIVERS UNLESS NOTED OTHERHIBE.

Th ALL MDRVIDUALLY FRAMTED AND GROUP OR PATTERN

AIRCRAFT CABLE: pane of
MOUNTING HEIGHTS AS INDICATED). PROVIDE ROUND WHITE |*
CANOPY COVER

16. TOR ALL POCTURE® BOPRED IIT} REFLECTORS) PROVIDE
ALIGNER CLIPS AT ALL FIXTURE JOINTS.

T2ALL LED LUMIMAMURS SHALL COMPLY FRITH LMT9 AND LINO
TESTING STANDARDS,

Au, BeTEROR usp rows ROUTED, enone routre
PO ROLLARD TYPE Lichtin PUCTORES SHALL Swim

Nashua City Hall
229 Main St
Nashua * NH

Health and security updates

DERRY WH OME
Te BPLBTO.9060 F; 003.452.4255

{32 MAPICHESTER ROAD, SUTE 4A

NDT FOR REGULATORY
APPROVAL PERMITTING,
OR CONSTRUCTION

wn
e
u
ua
eB
=
a
ee
<

SFT Leics, SHED, MANET, |
Han del aw Teer

<i
pa
g
S
a
Z
A

THE

SCHEDULE AND
SPECIFICATIONS

i ee
drawn: SAS.
checked: RPG)

scale: NTS.
date Ta
220140

proj. no. 2020-049

E102

Page Image
Finance Committee - Agenda - 9/16/2020 - P72

Footer menu

  • Contact