Floor Prep?
Base
20,275.00 20,275.00
Drywall w BP panels and metal studs
7,946.67 7,580.00
: Ultima 2x2 7,946.67
Pathcing Wall Cuts
1,500.00 1,500.00
800.00 800.00
700.00 700.00
19,523.00 19,523.00
400.00 1,400.00
18,123.00 18,123.00 18,123.00
666.67 666.67
666.67 666.67 666.67
Interior Signage - A002 for doors
Funishings
Roller Shades -(5) 4.5'x 7"
Millwork - Casework, Countertops.
Fire Protection
Reconfigure Fire Sprinklers
to
Subcontract Material DLK Labor Subtotal Cost | Division Cost Subtotal Cost
in Extended Opening
and install Steel Angles
@lalalulalwirte
Drywall and Repaint
Electrical and
Cost} Division Cost Cost Division Cost
50 50
7,200.00 7,200.00
te 7,
126,900.00 126,900.00
a
3
Sinks
VRF System
21,000.00 21,000.00
to remove and replace Condensor =
180,000.00 168,000.00
160,000.00 148,000.00
20,000,00
wlels| alu) elu) ele
Alarm Work
Work - Johnson Controls
»
6
Conditions
& Insurance
Toilets
Connex Box
Concrete &
