Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/16/2020 - P51

Finance Committee - Agenda - 9/16/2020 - P51

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
51
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

Floor Prep?
Base

20,275.00 20,275.00

Drywall w BP panels and metal studs
7,946.67 7,580.00

: Ultima 2x2 7,946.67
Pathcing Wall Cuts

1,500.00 1,500.00

800.00 800.00

700.00 700.00

19,523.00 19,523.00

400.00 1,400.00

18,123.00 18,123.00 18,123.00
666.67 666.67

666.67 666.67 666.67

Interior Signage - A002 for doors
Funishings

Roller Shades -(5) 4.5'x 7"
Millwork - Casework, Countertops.
Fire Protection

Reconfigure Fire Sprinklers

to
Subcontract Material DLK Labor Subtotal Cost | Division Cost Subtotal Cost

in Extended Opening

and install Steel Angles

@lalalulalwirte

Drywall and Repaint

Electrical and
Cost} Division Cost Cost Division Cost
50 50
7,200.00 7,200.00
te 7,
126,900.00 126,900.00

a
3

Sinks

VRF System
21,000.00 21,000.00

to remove and replace Condensor =
180,000.00 168,000.00

160,000.00 148,000.00

20,000,00

wlels| alu) elu) ele

Alarm Work
Work - Johnson Controls

»
6

Conditions

& Insurance

Toilets

Connex Box

Concrete &

Page Image
Finance Committee - Agenda - 9/16/2020 - P51

Footer menu

  • Contact