and MEP Demo
Wallcoverings
and Replace Concrete Trench for Floarbox
Frames and Hardware
9} Finishes
Floor
Wall Base
w BP panels and metal studs
ACT - Armstrong Ultima 2x2
‘Wail Cuts
interior Signage - A002 doors
Funishings
Raller Shades (3)
Millwork
Protection
Reconfigure Fire Sprinklers
1: Hazardous Materials
and
and MEP Demo
Old Rooftop Compressor
and install Steel
& Moisture Protection
Insulation
Frames Hardware
Framing
Box
7
Base
w BP and metal studs
~ Armstrong Ultima 2x2
Wall Cuts
Wall Hung Sanitizers
Interior - AQO2 for doors
4.5'x7
Millwork -
Fire
Fire Sprinklers
Allowance 1: Hazardous Materials
Conditions
Demolition
Demolition
and
Electrical and MEP Demo.
Concrete
New Concrete Pad at
Pavers and Site Work
Entry-5'x 6!
Frames and Hardware
Door
Framing
Finishes
DL KING & ASSOCIATES, INC
Nashua Hall Renovations
RFP0285-072220
Subcontract Material DLK Labor
3,511.67
Part B - Motor Vehicle and Tax
UM ary UP Material DLK Labor
3,511.67 | $
77,
6,622.33
655.67
37,773.00
666.67
Part C - Clerk
UP Subcontract Material OLK Labor
Subtotal Cost
32,509.00
3,645.00
26,669.00
1,995.00
12,250.00
7,946.67
500.00
500,00
8,635.00
920.00
7,
666.67
666.67
Subtotal Cost
77,705.00
2,000.00
666.67
460.00
20,553.00
7,946.67
1,950.00
1,100.00
850.00
6,000.00
23,916.00
Division Cost
32,203.00
26,363.00
1,995.00
30,933.00
6,093.33
666.67
4,780.00
7,580.00
500,00
500.00
8,635.00
920.00
7,715.00
666.67
666.67
Division Cost
12,350.00
500.00
500.00
82,657.00
3,845.00
2,000.00
40,661.00
6,093.33
666.67
6,460.00
19,861.00
7,580.00
1,950.00
1,100.00
850.00
44,293.00
6,520.00
37,773.00
666.67
666.67
Division Cost Subtotal Cost
50.
Division Cost
Division Cost
Division Cost
50