Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/2/2019 - P99

Finance Committee - Agenda - 1/2/2019 - P99

By dnadmin on Mon, 11/07/2022 - 13:14
Document Date
Fri, 12/28/2018 - 12:16
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/02/2019 - 00:00
Page Number
99
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010220…

,MCDERMOTT,

Exhibit A - Scope Of Services
Gas Holder Inspection

Decument Title: Document No. Rev:
Inspection Plan for Gas Holder 239822-000-SP-PL-00001 6
1.0 INTRODUCTION

2.0

3.0

4.0

4.1

4.2

This inspection plan identifies the scope of the work to be performed by CB&l Services, LLC (CB&I) to
evaluate the state of the 9400ff* gasholder located at City of Nashua Wastewater Treatment Facility in
Nashua, New Hampshire. This tank was originally constructed by CB&l in 1999.

PURPOSE

The purpose of the inspection is to provide technical support to prepare the gasholder for inspection and
possible repair.

The on-site technical support will be performed in accordance with industry standards and CB&l
requirements. Ali support work will be performed by qualified individuals, and the evaluation performed by
a professional engineer experienced in AP] 650 aboveground tanks.

REFERENCES

The following references will be utilized for the inspection and subsequent report:

API 650 Welded Tanks for Oil Storage

API653 Tank Inspection, Repair, Alteration, and Reconstruction — Fourth

Edition Addendum 3 November 2013

PREPARATION OF GAS HOLDER FOR INSPECTION

Prior io CB&/i Personnel Arrival
The following steps are to be completed by others prior to the arrival of CB&I on site:

Gas holder is to be cleaned and certified gas free

Safe access around the tank provided

Elevation of the piston is in the maintenance position

Remove ail bio-solids and sludge buildup that may be present under the piston
Physically isolate the tank from the balance of plant

Prior to Inspection Start
The following steps are to be completed by CB&I prior to the start of the inspection:

* Personnel to use appropriate PPE: Hard Hats, safety glasses, gloves, safety toed boots, long sleeve
shirts, and long pants

° Check isolation plan

* Confined Space Entry:

Page 3 of 4

Page Image
Finance Committee - Agenda - 1/2/2019 - P99

Footer menu

  • Contact