Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/2/2019 - P42

Finance Committee - Agenda - 1/2/2019 - P42

By dnadmin on Mon, 11/07/2022 - 13:14
Document Date
Fri, 12/28/2018 - 12:16
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/02/2019 - 00:00
Page Number
42
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010220…

GUNITE FINISH SUPPLY
Coping ¢ Tile » Plaster

3
3. Repair or replace pool entry stairs as needed. Hudson es

. 1 (800) 947-7807
@ Repair or replace steps.

Cost for task 3 $ 3, Be @, ao * CE pe he £

4, Removal and replacement of the concrete water feature deck.

¢, ® Professionally saw cut, jack hammer, and remove the water feature deck and removal all debris from
job site. The debris can be brought to the City land fill at no cost.

Pricing should be based on the existing concrete thickness not to exceed 5 “.

Form up new concrete pool patio at original size and shape for 4” thickness.

Grade and compact new deck area with processed gravel to insure 4” thickness.

Supply and install 6 x 6 #6 stee] meshes throughout the new concrete water feature deck area.

Install (18) non-skid tile depth markers into the concrete deck same as vinyl markers.

Install (18) non-skid tile no dive symbols into the concrete deck same as vinyl markers.

Install “Water Feature” provided by the City onto the new deck area per plan.

7. © Remove and install the Main Return Valve from the gutter located under the concrete slab.

Cost for task 4 $ SFE aoTel pas Zhis FeF Ethie ne 447. , G28.

5. Supply and install commercial grade Loop ~ Loc pool cover.

e Provide 3° x 3’ spacing of strapping throughout cover.

Provide heavy duty stainless steel springs at each end of the strap (approx. 120).

Brass anchors professionally installed into the concrete deck (approx. 120).

Padding to be incorporated under the pool cover as necessary for the inside cover of the pool.
Cover is required to overlap the pool deck by 18” over the entire pool deck.

Loop-Loc standard ‘spring green” colored super dense-mesh is required for the cover.

2 OO FDIS TAN EA

Cost for task 5 $ ZL é

6. Winter chemicals and monitoring (168,000 gallon capacity).

SARIN] 29 DG- oo
© Supply and install professional amount of vittteri#iag chemicals to the pool water.
e Monitor pool water and install chemicals as needed during winteemenths, > 7447 V@

© Stir pool water with submersible pumps when adding chemicals during the seadeae VS

o, Rtush pool 2. As EEE/ ALTee FRET UP

Cost for task 6 $ Lb ; BOO. — AsovE § sal

AMS 2 FE AA,

CROWNHILL POOLTOTALBID$ “~/6. Oo _©°

IFBO643-112818 CROWN HILL POOL REHABILITATION oO Wp So

BID SPECIFICATIONS and PRICING SUMARY Page | 2

Page Image
Finance Committee - Agenda - 1/2/2019 - P42

Footer menu

  • Contact