Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/2/2019 - P40

Finance Committee - Agenda - 1/2/2019 - P40

By dnadmin on Mon, 11/07/2022 - 13:14
Document Date
Fri, 12/28/2018 - 12:16
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/02/2019 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__010220…

PROPOSAL

LEE MAKARA DB. A. PROPOSAL NO.
GUNITE FINISH SUPPLY SHEET NO.

3 HOLLY LANE, HUDSON, NH 03051 > !
800-947-7807 www.guniterepair.com /} /y o/s QB.
PROPOSAL SUBMITTED TO: WORK TO BE PERFORMED AT: ~ ,

NAME

cry MAsh v4, WH,

ADDRESS *

229 MAUS SF

CA~ (ZB.
42- 1/2 B18

ADDRESS

Cour) LL Poo

27 4wkLE SF?

DATE OF PLANS

PHONE NO, #

ARCHITECT

Ob

We hereby propose to furnish the maleriats and perform the iabor necessary tor the completion of Gunite Pool Repair

[-] 1: Remove all coping and tiie. (eR. 8: Power wash all [7] Decking $4 Plaster
[J & Remove old Deck-Seal. (J 9 Repair and re-tila Spa Wall.
install new Deck-Seal around perimeter of Coping and - . . . ee
Deck edging. [} 10: Repair Decking as specified.
DECK-SEAL COLOR: (] WHITE [[] GRAY
[j 3: Remove all bad Gunite, repair bond beam and Tile line lb 11: Acid wash all plaster surfaces.
to solid structure of pool wall, i] 12: TEST all plumbing lines as needed.
he 4: Prepare all Plaster surfaces for re-ptaster. ["] 13: Replace Fitration Equioment as requested.
Method of preparation of Plaster. Kemove Ait ["] PUMP - Unit # _
(AMULTI-COAT fe WATER CUT Pamth — Ci FILTER - Unit # oe
a . a "} HEATER #
Be 5: Re-plasier Pool interior with standard MARBLE BASED -
: va [] SKIMMER - Unit #
POOL PLASTER with additive. .
Oe Perel [] Install Salt, Chlorine Generator
Li §&: Replaster Pool intezior using Bef Fer, Unit 4 _
DIAMOND BRITE POOL PLASTER. . . .
NOTE: SEE DIAMOND BRITE CONTRACT PA 14: Install Depth, Meter, and No-Dive Ties 10,
Color : bray? pe Water Line axDecking Edging 7Vle,
' bv Ss Trim at Steps and Pool Break.
C] 7: Install all NEW, £] COPING [TILE . LASFEA
(‘j Coping to be Maintenance Free Poured Cap 1S: All Gop g, The tully' guaranteed for 3S years.
Cj] OTHER COPING an Bg 16: Remove all garbage and debris from site.
[TILE SELECTION. vee
#& OTHER WORK TO BE COMPLETE A BAlisien 20f LIATEC,— EK. ep 0 BFE pp __
<.TUSTA LT AH PAce Fre} with TALC ETS, AS psjeaded

Ail material is guaranteed to be as specified, and the above work to be performed and completed in a workmaniike manner

TOTALCOST. Dollars s lie. 209 fD

PAYMENTS AS FOLLOWS oo

Merve; 27Fm. 4 aot tA FO oa SEE yioreb only)
L LiL... ee

Respectfully submitted, GUNITE FINISH SUPPLY

ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are nereby accepled. You are authorized to do ihe work as

specified. Payments will be made as outlined above. Mf
signature 4 t pL

Signature,

PROPOSAL. C

Page Image
Finance Committee - Agenda - 1/2/2019 - P40

Footer menu

  • Contact