Breakdown of Tasks, Personnel Hours, and Cost
BREAKDOWN OF TASKS - WATER STREET FINAL DESIGN
City of Nashua, NH
Total
QAIQC & Task Senior Sr.CADO | Admin. CACO
Tasks cM Managers Engineer Engineer Tech. Tech Hours Cabo Amounts
Final Plans (90%)
General Plan
Set Alignment a 3 $285
Label Curbing Gaometry and Provide Curting Table 2 4 4 19 $1 150
Drainage Modificalions and Notes 2 1 4 4 1 $1,365
Construction Notes 2 1 3 6 $930
Signing and Pavement Marking Plan 1 1 2 6 10 $1.230
Sign Summary Sheet 1 4 Ej $715
Bridge Railing Modifications 2 8 8
Detail Sheets) 4 2 4 4 6 20 $2880
Traffic Signal Modifications (Water St at Main St} 1 2 4 6 13 $1.775
100% Flans Incl. Response to Comments 6 4 2 4 4 4 24 $3,660
‘Special Provisions 4 4 6 14 $2.590
Coordination with CM dunng their Contractor Procurement 4 4 4 12 $2 300
Project Meatings / Corespondence/Coardinaton with City 12 12 24 $5 160
Subtotal 38 4 18 30 26 24 152 $24,040
TOTAL HOURS 38 4 18 30 26 24 152
HOURLY RATES $215.00 $215.00 $145.00 $95.00 $125.00 $85.00
LABOR COSTS $8,170 $7,310 $2,610 $2,850 $3,250 $2,040 $26,230
TOTAL LABOR = $26.230 00
VHB Water Street Final Design Fee 2022 05-19 ORAFT
Cate Prepared 6/9/2022