ISTRATEGIC
F ENVIRONMENTAL SERVICES
rinse as specified. (Additional cleaning of surfaces above ceiling tiles may be required, but it is
not known if surfaces above cetling tiles are impacted. Additional work js not specified in this
proposal.)
° SES will complete decontamination of the firing range floor from the bullet trap area, moving in
the direction of the offices. Trippel wash triple rinse. {All decontamination debris, and solutions
will be consolidated in T-Packs for disposal to licensed/approved disposal facility.)
« SES will apply light spray moisture of D-Lead solution to the carpeted areas of the office space
outside the firing range. This will aid the mitigation of airbome particles during removal of
carpeting and adhesive.
e SES will remove the carpeting, and adhesive from the office area. Carpeting and adhesive will
be sealed in double 6ml poly bags and consolidated in cubic yard boxes for disposal to approved
licensed disposal facility.
¢ SES will perform decontamination of all vertical and horizontal surfaces in office area from the
ceiling down using triple wash triple rinse method.
e SES will complete decontamination of flooring using same methad.
¢ Once all impacted debris have beea removed, and decontamination has been completed SES will
reclean ducting as far as can be reached, as well as grilles.
° SES will complete decontamination of mechanical ventilation room, and bullet trap room.
* {IEPA filtration units will be installed to capture and mitigate dust dispersion during onsite work
activities.
e HEPA vacuums wil be utilized to remove free standing dust from flooring, and all vertical and
horizontal surfaces.
e Once visible dust has been removed SES will conduct a triple wash and tripte rinse of all vertical
and horizontal surfaces that can be accessed in both mechanical and bullet trap room located
behind snail traps.
e All lead dust, and decontamination debris will be double bagged, and consolidated in cubic yard
boxes, properly labeled for their contents, and stored onsite in temporary staging area pending
approval to licensed approved disposal facility.
ASSUMPTIONS AND EXCLUSIONS
e SES will have full access to the work areas and space to stage equipment and/or materials. (This
includes space located near firing range to store T Packs priar to offsite disposal)
e All analytical testing, permits, regulatory notifications (if required) and associated engineering
tasks shall be performed by others at no cost to SES.
e Pricing associated with disposal and onsite times are estimated, actual units will be invoiced.
* Costs provided below, cover request for Site work to be completed Monday-Friday during normal
business hours 0700-1500.
e Pricing is based on non-prevailing wage rates.
e SES will not be responsible for damage to unmarked or inaccurately marked structureséutilities,
nor associated losses, nor repair costs.
e Reporting or analytical costs are not included in the proposal.
» Assumes disposal items can be picked up during normal business hours (M-F, 0700-1630).
PL8-0600 Page | 2