Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/6/2022 - P39

Finance Committee - Agenda - 7/6/2022 - P39

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
39
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

The H.L. Turner Group Inc.
SSS SS SSS SSS SSS SS ES
27 Locke Read Concord, NH 00301

603.228.1122 hiurner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION eure Vd
PM Structural PE Sr PO Tc HOURS
Segment 13 - 4 Water Street Boardwalk EA
13.1 - Board i I
oan walk River Piles & Bullding j » 8 8 ; 46
jConnections
13.2 - Boardwalk Structural Details 4 16 4 z 26
13.3 - Expanded Boardwalk Des'gn Coordination 8 a . : 20
13.4 - Design Expanded Boardwalk Section 4 20 4 8 i
13.5 - Design Retaining Wall{s) & River Piles for
Expanded Boardwalk Section : iy : 16 ae
13.6 - Design Piles - New Floating Dock 2 16 2 20
13.7 - Design the New Floating Dock & Gangway 2 16 18
System Including Intermediate Supports
13.8 - Re-examne Flood Rise Criteria with
Final P.le(s) Layout 4 oe : ay
13.9 - Assess Pile Erosion/Scour Ice & A 2 2 18
Woody/Miscellaneous Gebris Load:ngs
13.10 - P. i i i
repare Final Design Drawings & 8 40 16 140 i2
Specifications
j
> a > Ne A es ed Gees tee ele Gee es Ge Oe ee ee ee es eee ee ee ee fe ee ee ees ee ee es ee eee —_—_
4 172 176 236
Po SS SS SL SND GE ts OS cue rm) cre eS ag Cee ee et et ce ee es eee ee ee fe oe es te ot
1
TOTAL HOURS 44 172 72 176 26 | 490
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 44 $ 150.00 $ 6,600.00
Structural Engineer (Structural} 172 $ 185.00 $ 31,820.00
Project Engineer (PE} 72 $ 130.00 $ 9,360.00
Sr. Project Designer | (Sr PD} 176 $ 105.00 $ 18,480.00
Technica} Coordinator (TC) 26 § 100.00 $ 2,600.00
490 Total Fully Burdened Labor $ 68,860.00
Subconsultant $ :
Expenses $ 400.00

Estimated Direct Costs $5 400.00
TOTAL ESTIMATED COST = $ 69,260.00

Page Image
Finance Committee - Agenda - 7/6/2022 - P39

Footer menu

  • Contact