Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 7/6/2022 - P37

Finance Committee - Agenda - 7/6/2022 - P37

By dnadmin on Sun, 11/06/2022 - 21:47
Document Date
Fri, 07/01/2022 - 09:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 07/06/2022 - 00:00
Page Number
37
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__070620…

The H.L. Turner Group Inc.

27 Locke Road Concord. NH 03301 t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION ALLA Herat
PM Structural PE Sr PD Tc HOURS
Segment 11 - 58-60 Main Street Boardwalk
11.1 - Design Bracket Connections 2 16 2 20
11.2 - Transition Design - Boardwalk to Ramp 2 16 2 20
11.3 - Design - Ramp & Piles 2 24 2 28
11.4 - Riverbank Slope E&S 4 16 2 22
11.5 - Final Drawings & Specifications 8 56 4 80 8 156
Se Ae PY GD A ld ee ey ee Ge ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee oe
: 112 20 80 16 246
TOTAL HOURS 18 112 20 80 16 246
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 18 S$ 150.00 bs 2,700.00
Structural Engineer (Structural) 112 $ 185.00 $ 20,720.00
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PD) 80 $ 105,00 $ 8,400.00
Technical Coordinator (TC) 16 $ 100.00 $ 1,600.00
246 Total Fully Burdened Labor $ 36,020.00
Subconsultant $ =
Expenses $ 300.00
Estimated Direct Costs $ 300.00

TOTAL ESTIMATED COST= $ 36,3200)

Page Image
Finance Committee - Agenda - 7/6/2022 - P37

Footer menu

  • Contact