TASK DESCRIPTION ORC HOURS UN els
PM Structural PE Sr PO Te HOURS
Segment 8 - New River Crossing (Pedestrian Bridge)
8.1 - Bridge Abutment - Floodway "0.00 ft rise" Analysis 8 24 2 34
8.2 - Abutment Relocation and E&S Recommendations 4 16 2 22
iis aE nao Raa beeen eames [hy > JARS [eels GALS Boe AG Meal tae Own y-ai4 oa] cc, et
TOTAL HOURS 12 0 40 0 4 S6
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM)} 12 $ 150.00 $ 1,800.00
Structural Engineer (Structural} 0 § 185.00 $ -
Project Engineer (PE} 40 5 130.00 § 5,200.00
Sr. Project Designer I (Sr PD} 0 5 105.00 $ :
Technical Coordinator (TC) 4 § 100.00 § 400.00
| 56 Total Fully Burdened Labor $ 7,400.00
Subconsultant $ -
Expenses $ 100.00
Estimated Direct Costs
TOTAL ESTIMATED COST =
$ 100.00
¢
7,500.00