Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P867

Finance Committee - Agenda - 3/6/2019 - P867

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
867
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02534
FILL SEWER PIPE TO BE ABANDONED
PART 1 - GENERAL
1.01 WORK INCLUDED:
The existing sewer pipe to be abandoned in place shall be completely filled with
"Flowable Fill" after the sewerage has been re-routed through the new sewer main.
The work shall include all materials, labor, pumping, shoring, and cleanup required
to complete this item.
1.02 RELATED WORK:
Section 02631, PRECAST MANHOLES AND CATCH BASINS

1.03 SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF THE GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:

The contractor shall submit his proposed method for filling the pipe to be abandoned
to the Engineer for approval two (2) weeks prior to scheduling the work. The
"Flowable Fill" mix shall be comprised of Portland cement, water, sand and other
additives to insure that the material shall flow the entire length of the pipe and
completely fill the void. The mix design for the "Flowable Fill" shall be submitted to
the Engineer for approval.

PART 2 - PRODUCTS - NOT APPLICABLE

PART 3 - EXECUTION

3.01 INSTALLATION:

A No work shall be done without approval from the Engineer. The contractor shall
demonstrate to the Engineer by visual inspection or other means that the existing
pipe has been completely filled.

B. All work shall be done with the proper tools and by careful workmen competent to do

work.

END OF SECTION