Document Date
Meeting Description
Document Type
Meeting Date
Page Number
843
for approval prior to testing. Complete dimensions of the gauge for each diameter of pipe
to be tested shall be in accordance with ASTM D3034.
2. Any section of pipe found to exceed 7.5 percent deflection shall be deemed a failed pipe
and shall be excavated and replaced by the Contractor at his own expense.
END OF SECTION
2019 Sewer Replacement Project Polyvinyl Chloride Gravity Pipe and Fittings
Nashua, NH 02085-5
Page Image
