Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P838

Finance Committee - Agenda - 3/6/2019 - P838

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
838
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

B. Provide for control of slurry generated by sawing operation on both sides of wall.

C. When cutting a reinforced concrete wall, the cutting shall be done so as not to damage bond between
the concrete and reinforcing steel left in the structure. Cut shall be made so that steel neither
protrudes nor is recessed from the face of the cut.

D. Adequate bracing of area to be cut shall be installed prior to start of cutting. Check area during
sawing operations for partial cracking and provide additional bracing as required to prevent a
partial release of cut area during sawing operations.

E. Provide equipment of adequate size to remove cut panel.

3.04 PATCHING:

Rough patching shall be such as to bring the cut or cored area flush with existing
construction unless otherwise shown. Finish patching shall match existing surfaces as

approved.
END OF SECTION

2019 Sewer Replacement Project Cutting, Coring and Patching
Nashua, NH 01330-3

Page Image
Finance Committee - Agenda - 3/6/2019 - P838

Footer menu

  • Contact