2.04 MAINTENANCE AND PROTECTION OF TRAFFIC:
A.
B.
UNIFORMED POLICE OFFICERS
Measurement:
Uniformed police officers will be measured and paid by the actual number of
hours authorized, as determined by the Engineer. The Contractor shall supply
qualified uniformed officers as stated in Section 618 of the NHDOT Standard
Specifications for Road and Bridge Construction, (Approved and Adopted in
2016). Uniformed officers shall only be used when there are no available
flaggers and the Engineer has previously approved it. Daily coverage needs to
be approved by the Engineer. The Contractor's schedule for utilizing uniformed
officers shall be agreed upon cooperatively with the Engineer.
Payment:
The Contractor shall be reimbursed without markup for approved invoices
from the Nashua Police Department which shall be paid under budget
ALLOWANCE under ITEM 25. Payment shall constitute full compensation to
the Contractor for providing uniformed Nashua police officers with or without
vehicles, including all labor, high visibility safety gear, tools and any other
equipment necessary to complete the work as specified herein. Payment shall
be made only after Contractor has provided proof of payment to Police
Department.
FLAGGERS
Measurement:
The quantity of Flaggers will be measured by the HOUR based on the actual
number of hours authorized, as determined by the Engineer.
Payment:
The approved quantity of flagger hours shall be paid using ITEM 26. This
item has a budgeted ALLOWANCE as shown on the Bid Form. The
Contractor shall supply qualified flaggers as stated in Section 618 of the
NHDOT Standard Specifications for Road and Bridge Construction,
(Approved and Adopted in 2016). Daily coverage needs to be approved by the
Engineer. The Contractor's schedule for flaggers shall be agreed upon
cooperatively with the Engineer. Payment shall constitute full compensation to
the Contractor for providing qualified flaggers as required to direct traffic
through or around the Work as ordered by the Engineer, including all labor,
high visibility safety gear, tools and any other equipment necessary to
complete the work as specified herein. In no case shall the gross hourly rate
exceed $30/hour for straight time work and $45/hour for overtime work.
Payments to Contractor will be made based on approved hours and resulting
dollar amounts.
2019 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -11