any other equipment necessary to complete the work as specified in these
Specifications and as directed by the Engineer.
H. SILT SACK COMPLETE IN PLACE
Measurement:
The quantity of silt sacks to be measured under ITEM 23 will be the actual
number of silt sacks furnished and installed measured by the EACH, complete-
in-place, as specified in these Specifications and as directed by the Engineer.
Payment:
The accepted quantity of silt sacks shall be paid for at the contract unit price
under ITEM 23, and shall be full compensation for the installation of silt sacks
and maintenance during the construction period including decanting and
disposal of debris at the City landfill and all labor, tools and any other
equipment necessary to complete the work as specified in these Specifications
and as directed by the Engineer.
2.03 PROJECT START-UP AND PROJECT CLOSE OUT:
A. MOBILIZATION
Measurement:
Mobilization shall be measured as a LUMP SUM as specified herein. The total
cost for this item shall not exceed 5 percent of the total of all bid items
excluding this item.
Payment:
The contract price for ITEM 24 shall constitute full compensation to the
Contractor for the general mobilization and demobilization necessary to make
the contract operational, exclusive of the cost of materials. Payments toward
the lump sum will be made at each payment requisition based on the percent of
contract completed and the balance will be paid at final payment upon
completion of all project requirements. Should the contract be terminated prior
to completion, or the contract work not completed, total payment for this item
shall be proportional to the percentage of the contract completed. No additional
payment will be made if the contract value is increased.
B. WARRANTY INSPECTION:
All warranty inspections and related work shall not be separately measured for
payment but shall be considered incidental to the project.
2019 Sewer Replacement Project Measurement and Payment