Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P827

Finance Committee - Agenda - 3/6/2019 - P827

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
827
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

Payment:
The approved quantity of sawed bituminous pavement shall be paid for at the

contract unit price for ITEM 16 and shall be full compensation for saw cutting
bituminous pavement of any depth, including all labor, tools and any other
equipment necessary to complete the work as specified in these Specifications
and as directed by the Engineer.

E. UNCLASSIFIED EXCAVATION
Measurement:
The quantity to be measured under ITEM 17 shall be measured per CUBIC
YARD in place. Measurement for payment of this item shall only apply to the
unclassified excavation for the removal of material to establish subgrade for
construction of sidewalks, temporary trench patch and base gravels, and
removal of reclaimed stabilized base as required by the Engineer. Quantities
shall be measured for payment as directed and approved by the Engineer.
Over-excavation of subgrade will not be measured for payment.

Payment:
The approved quantity of unclassified excavation shall be paid for at the

contract unit price for ITEM 17 and shall be full compensation for the removal
and disposal of excavated material at the City landfill, including all labor, tools
and equipment necessary to complete the work as specified in these
Specifications and as directed by the Engineer.

F. RESET GRANITE CURB
Measurement:
The quantity to be measured under ITEM 18, Reset Granite Curb, shall be
measured by the LINEAR FOOT in accordance with the Contract Drawings,
directions from the Engineer, and as specified herein.

Payment:
The approved quantity of Reset Granite Curb shall be paid for at the contract

unit price for ITEM 18 and shall be full compensation for removal and
resetting of existing granite curb including crushed gravel base and all labor,
tools and any other equipment necessary to complete the work as specified in
these Specifications and as directed by the Engineer.

G. NEW VERTICAL GRANITE CURB (STRAIGHT)
Measurement:
The quantity to be measured under ITEM 19, New Vertical Granite Curb
(STRAIGHT), shall be measured by the LINEAR FOOT in accordance with
the Contract Drawings, directions from the Engineer, and as specified herein.

Payment:
The approved quantity of New Vertical Granite Curb shall be paid for at the

contract unit price for ITEM 6H and shall be full compensation for furnishing
and installing new vertical granite curb including crushed gravel base and all

2019 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150-8

Page Image
Finance Committee - Agenda - 3/6/2019 - P827

Footer menu

  • Contact