Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P825

Finance Committee - Agenda - 3/6/2019 - P825

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
825
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

testing, and all work incidental thereto and not specifically included for
payment under other items.

K. FLOWABLE FILL FOR PIPE ABANDONED IN PLACE COMPLETE IN PLACE
Measurement:
The quantity of flowable fill for pipe abandoned in place under ITEM 11 will
be measured by the CUBIC YARD based on delivery slips provided on the job
site (minus volume not used) as approved by the Engineer.

Payment:
The accepted quantity of flowable fill for pipe abandoned in place shall be

paid for at the contract unit price under ITEM 11, and shall constitute full
compensation for furnishing and installing flowable fill in the pipe to be
abandoned, complete in place as indicated on the drawings and/or as
specified, including excavation for access to the pipeline, pumping
equipment, backfill, and disposal of unsuitable materials at the City landfill
and all labor, tools, and equipment necessary to complete the work, and not
specifically included for payment under other items.

L. VIDEO INSPECTION OF OTHER SEWER LINES COMPLETE IN PLACE
Measurement & Payment
ITEM 12 is intended to be a contingency pay item to be used in the event that
video inspection of other sewer lines is required by the Engineer.
Compensation shall only be paid to the Contractor if expenditure of the
allowance, or portion of the allowance, is authorized by the Engineer.

An allowance value has been established on the bid form for this item as a
means to include funds in the event that the Contractor is directed to perform
video inspection and report preparation of sewer lines for which video
inspection is not otherwise required under other items of work. Costs for video
inspection and reporting shall be negotiated between the Engineer and the
Contractor in accordance with provisions for changes in the work in the
General Conditions.

2.022 ROADWAY RESTORATION COMPLETE IN PLACE

A. RECLAIMED STABILIZED BASE PROCESSED IN PLACE (12” DEPTH)
Measurement:
The quantity to be measured under ITEM 13, Reclaimed Stabilized Base
Processed in Place (12” Depth), shall be measured by the SQUARE YARD in
accordance with the Contract Drawings, directions from the Engineer, and as
specified herein.

Payment:
The approved quantity of Reclaimed Stabilized Base Processed in Place (12”

Depth) shall be paid for at the contract unit price for ITEM 13 and shall be full

2019 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -6