Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P823

Finance Committee - Agenda - 3/6/2019 - P823

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
823
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

diameter frame and cover, reconnecting sewer pipes with necessary
couplings and fittings, complete in place as indicated on the drawings and/or
as specified, including furnishing all materials, labor, tools, and equipment
necessary to complete the work, including but not limited to handling of
existing wastewater flows, by-pass pumping, excavation, backfill, manhole
bedding, removal of unsuitable materials at the City landfill, manhole
vacuum testing, and all work incidental thereto and not specifically included
for payment under other items.

F. REMOVE EXISTING SEWER MANHOLE COMPLETE IN PLACE
Measurement:
The quantity of sewer manholes to be removed under ITEM 6 will be measured
complete-in-place by the EACH, complete-in-place, as specified in these
Specifications and as directed by the Engineer.

Payment:
The accepted quantity of sewer manholes removed shall be paid for at the

contract unit price under ITEM 6, and shall constitute full compensation for
removal and disposal of the existing sewer manhole, complete in place as
indicated on the drawings and/or as specified, including handling of existing
wastewater flows, by-pass pumping, excavation, backfill, filling void with
suitable material, removal of unsuitable materials at the City landfill, and
furnishing all materials, labor, tools, and equipment necessary to complete
the work, and not specifically included for payment under other items.

G. MANHOLE INVERT RECONSTRUCTION COMPLETE IN PLACE
Measurement:
The quantity to be measured under ITEM 7 will be the actual number of
manhole inverts reconstructed measured by the EACH, complete-in-place, as
specified in these Specifications and as directed by the Engineer.

Payment:
The accepted quantity of manhole invert reconstruction shall be paid for at the

contract unit price under ITEM 7, and shall be full compensation for the
demolition of the existing invert and the reconstruction of the new brick invert,
by-pass pumping, decanting and disposal of debris at the City landfill and all
labor, tools and any other equipment necessary to complete the work as
specified in these Specifications and as directed by the Engineer.

H. CONNECT NEW SEWER TO EXISTING SEWER MANHOLE WITH
EXISTING HOLE COMPLETE IN PLACE
Measurement:
The quantity to be measured under ITEM 8 will be the actual number of sewer
line connections to existing manholes measured by the EACH, complete-in-
place, as specified in these Specifications and as directed by the Engineer.

2019 Sewer Replacement Project Measurement and Payment
Nashua, NH 01150 -4

Page Image
Finance Committee - Agenda - 3/6/2019 - P823

Footer menu

  • Contact