Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P641

Finance Committee - Agenda - 3/6/2019 - P641

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
641
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

6. Instructions for installation and repair

7. Manufacturer’s statement of compatibility between epoxy coating and
cementitious base coat.

8. The qualifications of the Contractor shall be submitted to the Engineer for
evaluation prior to commencement of work. These qualifications shall include
detailed descriptions of the following:

a. Name, business address, and telephone number of the Contractor

b. Name(s) of all supervisory personnel that will be directly involved in the
Project

c. Proposed product information showing compliance with the specified
requirements listed herein, including chimney seal, grout, and internal liner
material, and the respective manufacturer’s installation instructions.

d. Documentation of certification of the Contractor, specialty technician,
and/or installer by the product manufacturer and/or its authorized
representative

e. A reference list of previous projects on which the Contractor and/or installer
has rehabilitated manholes over the last two years, including project name,
project number, customer name, owner’s contact information (name and
phone number), and the number of manholes rehabilitated

f. To be acceptable, the Contractor/installer must have had a minimum of 500
manhole rehabilitation product installations and a minimum of five (5) years
of active experience in the commercial installation of the products.

g. The Contractor shall sign and date the information provided and certify that,
to the extent of his knowledge, the information is true and accurate and that
the supervisory personnel will be directly involved with and used on the
Project. Substitutions of personnel and/or methods will not be allowed
without prior written authorization by the Owner and Engineer.

1.05 WARRANTY:

A. All rehabilitation systems shall be warranted by the applicator and/or manufacturer
against failure for a minimum of two (2) years after acceptance by the Owner; in no case
shall the warranty be less than the manufacturer’s published standard warranty period.

2019 CIPP Lining Project Manhole Rehabilitation
Nashua, NH 02800-3

Page Image
Finance Committee - Agenda - 3/6/2019 - P641

Footer menu

  • Contact