A. The Contractor shall replace all pavement markings removed or covered-over in carrying out
the work, and as directed by the Engineer, no sooner than 48 hours after completion of
permanent pavement. The markings and respective mixture and application requirements
shall conform to the requirements of NHDOT Standard Specifications Section 632.
B. When directed by the Engineer, the Contractor shall provide temporary markings at no
additional cost to the Owner.
3.10 PAVEMENT REPAIR:
A. — If required in the contract or if permanent pavement becomes rough or uneven, permanent
pavement patches and trenches shall be repaired and brought to grade utilizing "infrared"
paving methods following completion of the construction.
B. The Contractor performing the work shall use care to avoid overheating the pavement
being repaired.
C. Pavement repair shall extend a minimum of 6-inches beyond all edges of the pavement
patch to assure adequate bonding at the pavement joints.
END OF SECTION
2019 CIPP Lining Project Road Restoration
Nashua, NH 02745-7