Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P632

Finance Committee - Agenda - 3/6/2019 - P632

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
632
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02745

ROAD RESTORATION

PART 1 - GENERAL
1.01 WORK INCLUDED:

Furnish all labor, equipment and materials required to install crushed gravel base
course, bituminous concrete pavement courses including temporary and permanent trench
paving curbing, sidewalks, disposal of excess material at the City landfill and restoration of
pavement markings in roadway areas where spot sewer repairs are required, manholes are to
be installed, manhole frames and covers are replaced, or as ordered by the Engineer and as
specified herein.

1.02 RELATED WORK:

A. Section 02300, EARTHWORK.

B. Section 02631, PRECAST MANHOLES
1.03 PAVEMENT DESCRIPTION:

A. GENERAL

In roadway areas where sewer spot repairs are required or ordered by the Engineer,
All trenched areas shall be paved with temporary bituminous pavement as detailed on the
plans as soon as practicable after installation of individual pipeline segments, but no trench
shall be without temporary pavement longer than seven (7) calendar days. After a minimum
period of 30 days, the trench patch pavement area shall be saw cut and removed beyond the
limits of the trench, and crushed gravel and binder and finish courses of pavement shall be
installed as detailed on the Contract Drawings, or as ordered by the Engineer. Miscellaneous
curbing and sidewalk disturbed by spot repairs shall be repaired as detailed on the Contract
Drawings, or as ordered by the Engineer.

1.04 REFERENCES

The following standards form a part of these specifications and indicate the minimum
standards required:

American Society for Testing and Materials (ASTM):

ASTM D1557 __ Test for Moisture-Density Relations of Soils and Soil-Aggregate
Mixtures Using 10 Pound Rammer and 18-Inch Drop

2019 CIPP Lining Project Road Restoration
Nashua, NH 02745-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P632

Footer menu

  • Contact