B. Instant developing of standard size digital photographs of the television monitor at problem
areas shall be taken by the Contractor on the request of the Engineer, so long as such
photographing does not interfere with the Contractor's operations.
C. Digital files of the entire inspection shall be provided to the Engineer upon completion
of the inspection. The playback shall be at the speed that it was recorded.
The Contractor shall be required to have all digital files and necessary playback
equipment readily accessible for review by the Engineer during the project.
D. The Contractor shall furnish printed internal inspection logs and two (2) DVD discs of the
entire inspection to the Engineer on completion.
END OF SECTION