Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P585

Finance Committee - Agenda - 3/6/2019 - P585

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
585
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

sand essentially free of organic matter, plastic fines (clay) and debris, and shall
meet the gradation requirements below:

Sieve Opening Percent Passing (weight)
6 inch 100
No 4 25 - 70
No 200 0-12

B. CRUSHED GRAVEL:

The Gravel Road Base will be NHDOT - Item 304.3 Crushed Gravel, or Item
304.4 Crushed Stone (Fine Gradation).

C. BACKFILL MATERIALS:
1. Class B Backfill:

Class B backfill shall be granular, well graded friable soil; free of rubbish, ice,
snow, tree stumps, roots, clay and organic matter; with 30 percent or less passing
the No. 200 sieve; no stone greater than two-third (2/3) loose lift thickness, or
six inches, whichever is smaller.

2. Select Backfill:

Select backfill shall be granular, well graded friable soil, free of rubbish, ice,
snow, tree stumps, roots, clay and organic matter, and other deleterious or
organic material; graded within the following limits:

Sieve Size Percent Finer by Weight
3” 100
No. 10 30 - 95
No. 40 10-70
No. 200 0-10

D. SEWER PIPE BEDDING MATERIAL

1. Sewer pipe bedding material shall be screened gravel or crushed stone meeting
the ASTM C33/C33M stone size No. 67..

2. Sand blanket material for sewer pipe shall be graded sand free from organic
materials, graded such that 100 percent passes a “4-inch sieve and a maximum of
15 percent passes a #200 sieve.

PART 3 — EXECUTION

3.01 DISTURBANCE OF EXCAVATED AND FILLED AREAS

2019 CIPP Lining Project Earthwork
Nashua, NH 02300-3

Page Image
Finance Committee - Agenda - 3/6/2019 - P585

Footer menu

  • Contact