SECTION 01331
DOCUMENTATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. This section covers the requirements for documentation to be furnished by the
Contractor on this project.
1.02 RELATED WORK:
A. Section 02650, CURED-IN-PLACE PIPE (CIPP) LINING OF EXISTING SEWERS
1.03 DOCUMENTATION:
A. The Contractor shall maintain CCTV inspection video of sewer segments, for each sewer
line segment undergoing lining under this contract and provide two (2) copies of the video
in digital format and a written report within five (5) working days of the work being
performed.
B. The report(s) as a minimum shall clearly identify:
1. Project Name
2. Street Location, Name, Intersection, Station
3. | Manhole Identification number.
4. Date of inspection
5. Total Length of Line Inspected
6. Line Size(s)/Joint Spacing/Type
7. Line and Manhole(s) Condition
8. Significant observations such as service connections, offset joints, drop joints,
broken/cracked pipe, protruding services, roots, collapsed sections, infiltration,
presence of scale and corrosion and other discernible features.
9. Reference to CCTV video number, including beginning and ending locations.
2019 CIPP Lining Project Documentation
Nashua, NH 01331-1