Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P573

Finance Committee - Agenda - 3/6/2019 - P573

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
573
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 01330

SUBMITTALS

1. SHOP AND WORKING DRAWINGS

A. As required by the General Conditions, Contractor shall submit a schedule of shop and working
drawing submittals.

B. In accordance with the accepted schedule, the Contractor shall submit promptly to the
Engineer, through its authorized resident representative at the job site, or by mail, three
(3) copies each of shop or working drawings required as noted in the specifications, of
equipment, structural details and materials fabricated especially for this Contract.

C. Such drawings shall show the principal dimensions, weight, structural and operating
features, space required, clearances, type and/or brand of finish of shop coat, grease
fittings, etc., depending on the subject of the drawings. When it is customary to do so, when
the dimensions are of particular importance, or when so specified, the drawings shall be
certified by the manufacturer or fabricator as correct for this Contract.

D. All shop and working drawings shall be submitted to the Engineer by and/or through the
Contractor, who shall be responsible for obtaining shop and working drawings from his
subcontractors and returning reviewed drawings to them.

E. Only drawings which have been prepared, checked and corrected by the fabricator should
be submitted to the Contractor by his subcontractors and vendors. Prior to submitting
drawings to the Engineer, the Contractor shall check thoroughly all such drawings to
satisfy himself/herself that the subject matter thereof conforms to the Contract Documents
in all respects. Shop drawings shall be reviewed and marked with the date, checker's name
and indication of the Contractor's approval, and only then shall be submitted to the
Engineer. Shop drawings unsatisfactory to the Contractor shall be returned directly to their
source for correction, without submittal to the Engineer. Shop drawings submitted to the
Engineer without the Contractor's approval stamp and signature will be rejected. Any
deviation from the Contract Documents indicated on the shop drawings must be identified on
the drawings and in a separate submittal to the Engineer, as required under subsection 6.17
Shop Drawings and Samples; D. Submittal Procedures, Paragraph 3 of the General
Conditions.

F. The Contractor shall be responsible for the prompt submittal and re-submittal, as
necessary, of all shop and working drawings so that there will be no delay in the work due to
the absence of such drawings.

G. The Engineer will review the shop and working drawings as to their general
conformance with the design concept of the project and general compliance with the
information given in the Contract Documents. Corrections of comments made on the

2019 CIPP Lining Project Submittals