and all additional examinations, investigations, explorations, tests, studies, and data with the Contract
Documents.
J. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution
thereof by ENGINEER is acceptable to CONTRACTOR.
K. The Contract Documents are generally sufficient to indicate and convey understanding of all
terms and conditions for performance and furnishing of the Work.
ARTICLE 8 - CONTRACT DOCUMENTS
8.01 Contents
A.
1. The Contract Documents are defined in Article 1 of the General Condition as amended
herein.
2. The Drawings are entitled ”2019 CIPP Lining Project, prepared by Hayner/Swanson,
Inc., prepared for the Division of Public Works, City of Nashua, dated January 14, 2019,
consisting of 34 Sheets”.
3. The following documents are incorporated by reference or otherwise indicated:
a. New Hampshire Department of Transportation “Standard Specifications for Road
and Bridge Construction”, latest edition, incorporated by reference or unless
otherwise indicated.
os
. “Manual of Uniform Traffic Control Devices”, latest edition, incorporated by
reference.
c. City of Nashua, Standard Specifications for Sewers and Drains, Revised,
Approved and Adopted June 15, 1992, incorporated by reference.
d. City of Nashua, Standard Specifications for Road Construction, Approved and
Adopted June 11, 1986, incorporated by reference.
e. City of Nashua, Standard Specifications for Sidewalk Construction, Approved
and Adopted August 28, 1995, incorporated by reference.
f. City of Nashua Ordinance O-03-219 (Amended), Approved November 14, 2003.
ARTICLE 9 - MISCELLANEOUS
9.01 Terms
A. Terms used in this will have the meanings indicated in the General Conditions.
AG - 5 of 7