Finance Committee - Agenda - 3/6/2019 - P477

By dnadmin on Mon, 11/07/2022 - 13:11
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
477
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

STANDARD FORM OF AGREEMENT

BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the day of in the year 2019 by and between
the City of Nashua, New Hampshire (hereinafter called OWNER) and Kenyon Pipeline Inspection, LLC
and its successors, transferees and assignees together (hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:

The scheduled work for the 2019 CIPP Lining Project consists of work on various residential and
arterial streets in Nashua. Work includes approximately 22,310 linear feet of cure-in-place pipe
(CIPP) lining, sewer manhole rehabilitation, installation of new sewer manholes, point repair of
sewer lines at various locations, and miscellaneous other sewer and paving items.

ARTICLE 3 - ENGINEER
3.01 The Project has been designed by: Division of Public Works
Engineering Department
9 Riverside Street
Nashua, NH 03062
who is hereinafter called ENGINEER and who is to act aa OWNER's representative, assume all duties and
responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.
ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Dates for Substantial Completion

A. Project will begin once a written “Notice to Proceed” is issued.

AG - 1 of 7