LIST OF SUBCONTRACTORS
(to be submitted after bid opening)
Within two hours after the completion of the opening of the bids, the general contractors who
submitted the three lowest bids must provide a list of each subcontractor who will provide labor or a
portion of the work or improvement to the contractor for which the subcontractor will be paid an amount
exceeding one percent (1%) of the prime contractor's bid or $50,000, whichever is greater, and the
number of the license issued to the subcontractor. If a general contractor fails to submit such a list
within the required time, the bid shall be deemed not responsive. To be deemed a responsive bid, this
form must be submitted even if no subcontractors are required to be listed. In that case, the bidder should
state “None” (or similar language stating that no subcontractors need to be listed) in the space below
(Refer to General Condition 6.09.H.)
Subcontractor/Address
(Sace hy Osh. | +
Cawwinity Qiohalt
dy
|
Nog el li Lihle
TAC Con shiuckion
‘ov beCim. { Prin Chun,
SYR Con 5 trite har
aX Petey sy Zo
loo robe Le, CT Cbb0~~
ade Re terns Ze
DloomtieldA CT O00 3~
SS Meerestay sf.
bite bone yy LHIP_O¢ SOs
FO Bmx ‘Gf
Litem nate Late ATS
16? Care ey Fen SZ,
(Béna cn the oe LAP OWES SZ
Dollar Value and
description of work
1 @0, 000.09
Re. C ‘arm e,
239 000.0034
Cof id erin C
260,000.07
boc lain ine Takin ne
35G000.¢0
Cashnes
350 C20,.0)
CEs ings
Bid Form
BF 8 of 8
