LIST OF SUBCONTRACTORS
(to be submitted with bid)
The name and address of each subcontractor who will be paid at least five percent (5%) of the prime
contractor's total bid shall be listed below. To be deemed a responsive bid, this form must be submitted
even if no subcontractors are required to be listed. In that case, the bidder should state “None” (or similar
language stating that no subcontractors need to be listed) in the space below. (Refer to General Condition
6.09.H)
Name Address of aS Portion of Work
d Peters pc\
Gort Cs phalt- hee bi mune Room tne lt | CP bbipi~ — Calel Plane
~J 21. Pe bees 12 SS,
aa Ly (isahal ec} let. dns Bleombete , CT Ole CO3~ Reclamn x
a [a5 fer ST,
Moce| lon. (OS Mea bestnss
l AC. St i Legit 7, 117 14. O1§ Gf Len lesmnsag
PAN SA Cctv,
Cerlo Cn Sy ve bry PO Box 4 | Leowuaste mA0lsy ( GS ng Vey kK
Ny nC . JOR Laacaste $4,
K Cshuc hon | Serr whe Wt DUS Cr, thing (Wey, ke
BF 7 of 8
Bid Form