Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P109

Finance Committee - Agenda - 3/6/2019 - P109

By dnadmin on Mon, 11/07/2022 - 13:10
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
109
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

A. CONTRACTOR intends that all policies purchased in accordance with paragraph 5.06 will protect OWNER,
CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants, and all other individuals or entities
identified in the Supplementary Conditions to be listed as insured ( and the officers, directors, partners, employees,
agents, and other consultants and subcontractors of each and any of them) in such policies and will provide primary
coverage for all losses and damages caused by the perils or causes of loss covered by the policy. All CONTRACTOR
policies must contain provisions to the effect that in the event of payment of any loss or damage the insurers will have
no rights of recovery against any of the insured or additional insured there under. CONTRACTOR waive all rights
against OWNER each other and their respective officers, directors, partners, employees, agents, and other consultants
and subcontractors of each and any of them for all losses and damages caused by, arising out of or resulting from any
of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work; and, in
addition, waive all such rights against Subcontractors, ENGINEER, ENGINEER’s Consultants, and all other
individuals or entities identified in the Supplementary Conditions to be listed as insured or additional insured (and the
officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them)
under such policies for losses and damages so caused.

ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES
6.01 Supervision and Superintendence

A. CONTRACTOR shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention
thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the
Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences, and
procedures of construction, but CONTRACTOR shall not be responsible for the negligence of OWNER or
ENGINEER in the design or specification of a specific means, method, technique, sequence, or procedure of
construction which is shown or indicated in and expressly required by the Contract Documents. CONTRACTOR shall
be responsible to see that the completed Work complies accurately with the Contract Documents.

B. At all times during the progress of the Work, CONTRACTOR shall assign a competent resident superintendent
thereto who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary
circumstances. The superintendent will be CONTRACTOR’s representative at the Site and shall have authority to act
on behalf of CONTRACTOR. All communications given to or received from the superintendent shall be binding on
CONTRACTOR.

6.02 Labor; Working Hours

A. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out, and construct the Work as
required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the Site.

B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent
thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during
regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday,
Sunday, or any legal holiday without OWNER’s written consent (which will not be unreasonably withheld) given after
prior written notice to ENGINEER.

C. The following list of streets will require prior approval to close a lane and may require flagging or police details and
may have work time restrictions.

Allds Street East Hollis Street
Amherst Street Henri Burque Hwy
Arlington Street Kinsley Street
Bridge Street Ledge Street
Broad Street Main Dunstable Road
Broad Street Parkway Main Street

Canal Street Manchester Street
Central Street Pine Hill Road

GC - 19 of 53

Page Image
Finance Committee - Agenda - 3/6/2019 - P109

Footer menu

  • Contact