Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P386

Finance Committee - Agenda - 3/20/2019 - P386

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
386
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

1.5. SUBMITTALS

A. Supplier’s Hardware Schedule - Submit finish hardware schedule, shop
drawings, and product data. Hardware schedules are intended for
coordination of the work. Review and acceptance by ENGINEER or OWNER
does not relieve CONTRACTOR of his exclusive responsibility to fulfill the
requirements as shown and specified.

B. Finish Hardware Schedules - Based on finished hardware indicated, organize
hardware schedule into groups or sets showing complete designations of
every item required for each door opening.

1. Number, location, hand, and material of each door opening. (Hands and
swings to be determined in relation to key side of opening).

2. Type, style, function, size, finish, manufacturer’s catalog number, and
quantity of each hardware item.

3 Name and manufacturer of each item.

4. Fastening requirements.

5 Explanation of abbreviations used if other than DHI abbreviations and
symbols.

6. Special mounting locations and instructions.

7. Keying information.

C. Furnish an index cross-referencing door number, engineers hardware group
and suppliers hardware group.

D. Samples - If requested by ENGINEER, submit one sample of each type of
exposed hardware, finished as required, and tagged with full description for
coordination with the schedule.

E. Certificate - When requested by ENGINEER, furnish manufacturers’
certificates attesting that hardware items conform to the reference under
which the items are governed.

F. Operating Instructions - Furnish OWNER with one (1) complete set of
installation instructions, including manufacturer’s catalog, special adjusting
tools and maintenance instructions. One complete catalog shall be furnished
for each manufacturer listed in the approved hardware schedule.

G. Templates - The hardware supplier shall provide necessary templates
and/or physical hardware to all trades or factories requiring them in order
that they may cut, reinforce, or otherwise prepare their material or product
to receive the hardware item. If physical hardware is required by any
manufacturer, the hardware supplier shall ship them such hardware via
prepaid freight in sufficient time to prevent any delay in the execution of
their work.

File No. 3066.09 Door Hardware 08712- 2 of 5 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P386

Footer menu

  • Contact