Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P367

Finance Committee - Agenda - 3/20/2019 - P367

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
367
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

SECTION 03310
CONCRETE COATINGS
PART 1 - GENERAL
1.1 SUMMARY

A. This specification is for the coating to be used for the concrete within the
sump riser building and the interior surfaces of the concrete manholes.

1.2 QUALITY ASSURANCE

A. CONTRACTOR qualifications: CONTRACTOR shall be qualified in the field of
concrete repair and protection with a successful track record of 5 years or
more. CONTRACTOR shall maintain qualified personnel who have received
product training by a manufacturer’s representative.

B. CONTRACTOR shall install materials in accordance with all manufacturer
safety and weather requirements or as modified by applicable rules and
regulations of local, state and federal authorities having jurisdiction.
Consult Safety Data Sheets (SDS) for complete handling recommendations.

1.3. DELIVERY, STORAGE, AND HANDLING

A. All materials must be delivered in original, unopened containers with the
manufacturer’s name, labels, product identification, and batch numbers.
Damaged material must be removed from the site immediately.

B. Store all materials off the ground and protect from rain, freezing or
excessive heat until ready for use.

C. Condition the specified product as recommended by the manufacturer.
1.4 CONDITIONS
A. Environmental Conditions: Do not apply material if it is raining or snowing
or if such conditions appear to be imminent. A minimum application

temperature of 40 degrees (°) Fahrenheit (F) and rising is required.

B. Protection: Precautions should be taken to avoid damage to any surface
near the work zone due to mixing and handling of the specified material.

1.5 SUBMITTALS

A. Submit copies of manufacturer’s literature to ENGINEER at least 7 days prior
to delivery to the site, including Product Data Sheets and appropriate SDS.

File No. 3066.09 Concrete Coatings 03310 - 1 of 3 December 2017