Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P366

Finance Committee - Agenda - 3/20/2019 - P366

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
366
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

3.9 PROTECTION OF WORK
A. New concrete shall be protected by barricades during curing to prevent damage
by vehicular or pedestrian traffic. Damaged concrete shall be repaired or
replaced at CONTRACTOR’s expense.
3.10 QUALITY CONTROL
A. CONTRACTOR shall be solely responsible for the quality control of all concrete
and shall retain an independent testing laboratory to conduct testing of the
concrete for slump, air content and compression.
B. Concrete which does not meet the requirements of these specifications may be
rejected by ENGINEER, and shall be removed and replaced at CONTRACTOR’s
expense.

3.11 SIDESLOPE RISER PIPE PENETRATIONS

A. Neatly fill annular space between concrete wall and sideslope riser pipes with
non-shrink grout.

3.12 CLEANING

A. During cleaning operations, protect work which may be damaged, stained, or
discolored.

[END OF SECTION 03300]

P:\3000s\3066.09\ Source Files\Type II App\Specifications\ Division 3 Specifications\03300 CIP Concrete.docx

File No. 3066.09 Cast-in-Place Concrete 03300 - 6 of 6 December 2017

Page Image
Finance Committee - Agenda - 3/20/2019 - P366

Footer menu

  • Contact