SECTION 02710
CULVERTS
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. CONTRACTOR shall provide all labor, materials, tools, and equipment and
perform all operations necessary to furnish, install culverts, including
necessary joints and connections as required. Culverts shall consist of sections
of pipe of the kinds and sizes shown on the Drawings and as specified, laid on a
firm foundation in accordance with these Specifications.
1.2 SUBMITTALS
A. CONTRACTOR shall submit manufacturer’s technical product data and
installation instructions for culvert piping and appurtenances to ENGINEER in
advance of delivery of materials to the site.
1.3. PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Inspection of Material
1. When delivered to the site and prior to unloading, CONTRACTOR shall
inspect all pipe and accessories for loss, damage, or lack of specified
identification and markings.
2. Any defective or improper material shall be immediately marked and
shall not be unloaded.
B. Storage
1. In shipping, storing, and installing, pipe shall be kept in a sound,
undamaged condition. It shall at all times be handled with care and shall
not be dropped, dumped, or bumped against any other object. Any
material(s) damaged shall be marked and immediately removed from the
job site.
C. Defective Materials
1.
Materials found at any time during the progress of the work to have
cracks, flaws, or other defects will be rejected and marked, and
CONTRACTOR shall promptly remove such defective material from the
work site.
File No. 3066.99
Culverts 02710 - 1 of 3 December 2017