Document Date
Meeting Description
Document Type
Meeting Date
Page Number
348
3.7. FINAL INSPECTION
A. A final inspection shall be performed by the Installation Contractor, the CQA
Consultant, ENGINEER, and OWNER prior to the Installer’s crew demobilizing
from the site. All identified problem areas shall be repaired by the Installation
Contractor and accepted by the CQA Consultant prior to the installation crew
demobilizing from the site.
[END OF SECTION 02550]
P:\3000s\3066.09\Source Files\Type II App\Specifications\ Division 2 Specifications\02550 Geomembrane.docx
File No. 3066.09.00 Geomembrane 02550 - 14 of 14 December 2017
Page Image