Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P338

Finance Committee - Agenda - 3/20/2019 - P338

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
338
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

F. The manufacturer shall furnish complete written instructions for storage,
handling, installation, seaming, repair, and inspection of the Geomembrane
material in compliance with this Specification and conforming to the conditions
of the warranty. A copy of all manufacturer’s literature shall be submitted to
the CQA Consultant upon request.

1.5 PROJECT MEETINGS

A. A _ preconstruction meeting is required between OWNER, ENGINEER,
CONTRACTOR, the CQA Consultant, and the Installation Contractor, prior to the
start of GGomembrane installation work on-site. The intent of the meeting is to
discuss the requirements of these Specifications to ensure that all parties
involved are familiar with their respective responsibilities.

B. The Installation Contractor shall attend other construction meetings that may
be held during the installation of the geosynthetics associated with the project.
These meetings will be held to review work activities, discuss the project
schedule, provide clarifications, and review possible questions.

1.6 QUALITY ASSURANCE

A. OWNER will retain a the CQA Consultant to perform construction quality
assurance services during the GGomembrane installation. The CQA Consultant
shall be on-site for observation of GGomembrane handling, deploying, seaming,
testing, and repair work.

B. The Installation Contractor shall cooperate with the CQA Consultant, and
furnish tools, samples of materials, and assistance as requested.

C. The Installation Contractor shall apprise the CQA Consultant of the proposed
work schedule on a daily basis, and shall inform the CQA Consultant of schedule
changes in a timely manner.

D. The Installation Contractor shall advise ENGINEER and the CQA Consultant
before placing orders for Gcomembrane, so that arrangements may be made, if
desired, for inspection of the Geomembrane during manufacturing. The
Installation Contractor shall at all times furnish the CQA Consultant and its
representatives facilities, including labor, and allow proper time for observing
and testing materials and workmanship. The Installation Contractor shall allow
time in the schedule for possible delays due to the necessity of materials and
workmanship being observed, tested and accepted for use. The Installation
Contractor shall furnish, at his/her own expense, all samples of materials
required by ENGINEER or the CQA Consultant for testing.

E. Geomembrane shall be sampled and tested in accordance with the approved
Construction Quality Assurance (CQA) Plan.