Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P312

Finance Committee - Agenda - 3/20/2019 - P312

By dnadmin on Mon, 11/07/2022 - 13:09
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
312
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

SECTION 02200
EARTHWORK
PART 1 - GENERAL
1.1 SCOPE OF WORK

A. CONTRACTOR shall provide all labor, materials, equipment and incidentals
necessary to perform the earthwork required to complete the Work shown on
the Drawings and specified herein, including, but not limited to: excavation,
placement, grading, and compaction of earth materials; sampling and testing
(laboratory and field) earth materials; and disposal and stockpiling of surplus
soil.

B. CONTRACTOR shall work with the Construction Quality Assurance (CQA)
Consultant and provide assistance as needed so that the required quality
assurance sampling and testing may be performed. Quality assurance
activities shall be considered germane to the Work and not be a cause for
scheduling delays. Quality assurance requirements are defined in the
Construction Quality Assurance Plan.

1.2 SUBMITTALS

A. Prior to initiating interface strength tests (See Section 02560), CONTRACTOR
shall provide the following information to ENGINEER:
1. the proposed material source or sources (either on-site or off-site); and
2. laboratory test data in conformance with the requirements of Part 2.2.

B. Following approval of materials by ENGINEER, CONTRACTOR shall provide the
testing laboratory with samples of each type of soil to be tested for interface
strength.

C. As soon as the information is available, CONTRACTOR shall provide ENGINEER
the results of field and laboratory tests performed on soil. Test reports of field
tests are to be submitted by the following morning.

D. If Work is interrupted for reasons other than inclement weather, then
CONTRACTOR shall notify ENGINEER a minimum of 24 hours prior to the
resumption of Work.

File No. 3066.09 Earthwork 02200 - 1 of 14 December 2017