Document Date
Meeting Description
Document Type
Meeting Date
Page Number
308
3.3 MAINTENANCE AND INSPECTION
A. Contractor shall inspect and document all temporary erosion control measures
as required by the Construction Stormwater Pollution Prevention Plan. Any
damaged erosion control measure shall be repaired/replaced promptly.
[END OF SECTION 02000]
P:\3000s\3066.09\Source Files\Type II App\Specifications\ Division 2 Specifications\02000 Erosion.docx
File No. 3066.09 Erosion and Sedimentation Control 02000 - 4 of 4 December 2017
Page Image