January 10, 2019 Page 9
20190110 Bid Item Defintions.docx 3066.09
Bid Item No. 15 Utility Trenches
This Bid Item includes all labor, materials, equipment, tools, and apparatus needed to
perform all operations necessary to furnish and install HDPE force mains, conductors, and
PVC electrical conduit of the size and pressure ratings in accordance with the Drawings and
Specifications. Utility trenches shall be installed as shown on the Drawings, and force mains
shall be pressure tested as specified. This Bid Item shall include excavating soil, furnishing
and placing Drainage Sand, conductive pipe warning tape, and all materials required for a
complete installation.
Payment for Utility Trenches will be made on a linear foot basis for the actual amount
installed.
Bid Item No. 16 Connection to the Phase II Leachate Collection System
This Bid Item includes all labor, materials, equipment, tools, and apparatus needed to
connect the Phase III leachate collection system to the existing Phase II leachate collection
system as shown on the Drawings. Included in this item is furnishing and installing the HDPE
pipes and fittings, connecting the leachate force main to the gravity main, placing the gravity
main and primary cleanout risers over the Phase II liner system, placing the secondary
cleanout riser in a trench below the Phase III liner system, and connecting the existing
leachate collection pipe. Excavation of waste and leachate collection material, cutting and
capping existing pipe, backfilling the excavation with waste, and restoration of the Phase II
leachate collection materials are incidental to this item.
Payment for this Bid Item will be made on a lump sum basis.
Bid Item No. 17 Stormwater Basin
This Bid Item includes all labor, materials, equipment, tools, and apparatus needed to
perform all operations necessary to construct a functioning stormwater basin as indicated
on the Drawings.
a. Dredging the Existing Portion of the Basin includes removing accumulated sediment from
within the existing portion of the Stormwater Basin as indicated on the Drawings to
restore to design grades. Dredged sediment shall be hauled to the active face of the
landfill.
Payment for this Bid Item will be on a lump sum basis.
b. Remove Portion of the Existing Culvert includes exposing, cutting, and removing a portion
of the 12-inch diameter corrugated plastic pipe (CPP) culvert, and disposal of the culvert
and the associated headwall at the active face of the landfill. Soil excavation to expose
the culvert is included in other Bid Items.
Payment for this Bid Item will be on a lump sum basis.
SANBORN I HEAD