Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/20/2019 - P40

Finance Committee - Agenda - 3/20/2019 - P40

By dnadmin on Mon, 11/07/2022 - 13:08
Document Date
Wed, 03/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/20/2019 - 00:00
Page Number
40
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__032020…

Perform chemical treatment in up to 84 acres with up to 3 applications with Sonar

One and/or Sonar H4C herbicides at 10-20 ppb - inclusive of required certified mailings to a maximum of
60 abutters and publication of 1 newspaper legal notices; all labor, chemical & equipment needed for the
treatment. (Note. should less acreage require treatment or a different herbicide application rate be required
the cost will be adjusted accordingly; notifving additional abutters via certified mail will carry a cost of

$9. 00/abutter)

June $18,121.00 Payment due upon completion (1st treatment)
Late June $18,121.00 Payment due upon completion (2nd treatment)
Mid July $18,121.00 Payment due upon completion (3rd treatment)

June or July $54,363.00 Payment due upon completion

Sandy Pond:
Perform spring survey, up to 2 applications of Sonar (Fluridone) herbicide/algaecide treatment (if necessary),
post-treatment survey, preparation and submittal of State reporting as required.

May - July $2,060.00 Payment due upon completion

Task 3:

Nashua River:

Perform herbicide residue testing after each treatment, assuming 2 sampling rounds and analysis of 4
sampling locations total for each of 3 treatments (12 samples total) is required

(Note: The number and frequency of post-treatment herbicide residue samples is determined by the NH DPC
following approval of the NH DES final treatment map. SOLitude is only responsible for coordination of
sample collection and has no influence on the number of samples required by the Special Permit. Should
additional sampling be necessary, there will additional charges of $150/sample analyzed and $350-$500 per
sample collection round.)

June — July $3,900.00 - Payment due upon completion of each sampling event.

Task 4:
Nashua River: Perform post-treatment survey and submittal of the required written project completion
report to the State.

October $1,200.00 Payment due upon completion

Task 5:
Sandy Pond:
Pond Algae Treatment:

1. When requested, any infestation of algae found in the pond at the time of application, shall be treated
and controlled through the application of aquatic algaecides, aquatic herbicides, and aquatic
surfactants as required to control the specific varieties of algae present at the time of service.

2. Ponds which have more than fifty percent (50 %) coverage of undesirable algae will be treated in a
series of two (2) to three (3) applications as required to help prevent any damage to beneficial
aquatic life.

$515.00 per Treatment
Note a single treatment is authorized at this time, additional treatments would require client
authorization

Page Image
Finance Committee - Agenda - 3/20/2019 - P40

Footer menu

  • Contact