COMPETIT TALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES MARKET | PROPOSED
(Indicate basis for price comparison) PRICE PRICE
INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD
-INCLUDE BUT NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH
AS DESIGN, SURVEY, SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION,
RECORD DWGS., START-UP, SPECIAL SERVICES, ETC.
ork
category Task
—
Estimates | Average] Estimated
Hours Rate Cost
Bidding
Construct.
Admin.
Resident
Services
Start-up
Services
O&M
Manual
Drawings
Principal-in-Charge 8] $ 63.00 504.00
Project Manager 65] $ 58.00 3,770.00
n
ect Engineer
Lead Project Engineer 814] $ 43.00 35,002.00
10] $ 59.00 590.00
Project Engineer 764] $ 27.00 20,628.00
. ect nee -
Civil 58) $ 45.00 2,610.00
Sr. Project Architect 0) $ 41.00 -
r. neer -
Structural
ect Engineer -
Mechanical
r. neer -
Instrument.
r. neer -
Electrical
CADD Operator 116) $ 28.00 3,248.00
56| $ 56.00 3,136.00
0} $ 41.00 -
208| $ 58.00 12,064.00
184) $ 56.00 10,304.00
min. Assistant 116} $ 20.00 2,320.00
ect
tative 1,404 1,404] $ 27.00 37,908.00
1,910} 1,404] 202) 150) 137 3,803 -
132,084.00
comments: