By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
70
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

2019 Sidewalk Program — Curbing
Broad Street and East Dunstable Road

SPECIAL CONDITIONS

Working Hours

A. Except as stated below, Normal working hours shall be from 9:00 AM to 3:00 PM
Monday through Friday. Working hours can be extended with written authorization
from the Director of Public Works.

B. No weekend, holiday or night work will be allowed without advance written approval
of the City Engineer. Any request for approval for weekend, holiday or night work
must be made in writing to the Engineer at least one week in advance of the work.

Notice to Proceed and Completion

A. It is anticipated that the City of Nashua will issue a Notice to Proceed on or
about May 20, 2019.
B. Installation of granite curb on Broad Street shall be complete by June 7, 2019.
C. Installation of granite curb on East Dunstable Road shall be complete by October 15,

2019.
ADA Compliance

A. Contractor shall take measurements as needed before work commences at each ramp
location to assure that Contractor has all control needed to install curbing
improvements in compliance with ADA.

B. City representative will meet with the contractor in advance of work at each ramp
location to assure concurrence on the limits and extent of work needed to achieve
ADA compliance.

C. Ifin the opinion of the contractor, construction of an ADA complaint ramp is not
possible at any location based on the concept presented on the Contract Drawings, the
contractor shall notify the Engineer in writing in advance of any construction
activities at that location. Unless notifications of any such concerns are made to the
Engineer, Contractor shall be responsible for the ADA compliance of the finished
work.

Protection of Catch Basins

A. Contractor shall be responsible to protect catch basins in close proximity to the work and
as directed by the Engineer.

SC - 1 of 2