Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/15/2019 - P43

Finance Committee - Agenda - 5/15/2019 - P43

By dnadmin on Mon, 11/07/2022 - 13:07
Document Date
Fri, 05/10/2019 - 12:51
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/15/2019 - 00:00
Page Number
43
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051520…

a — - = : ce er pa nsary—ne

§4t44t Value - analysis _ / | ; : 7 NA _-
| |

|

|

4

§$4.1.442 Detailed cost estimating beyond that
_ required in Section 6.3.

CM / Owner

§44.1.13 On-site project representation J __ NA —.__
§4.1.1.14 Conformed documents for construction | . i ed

« Aawier ” a, : |
| §4.1.1.15 As-designed record drawings __ —_——-—__|___ NA _. I
$444.16 As-constructed record drawings We ; NA ae |
| § 441.17 Post-occupancy evaluation — ee A
| §4.1.1.18 Facility supportserviees i. ee NIA sd
§4.1.1.19 “‘Tenant-related services ee } - ~ Ree
§ 4.1. 4.20 Architect’s coordination of the Owner's

__consultanis

“§44A. 4. 21 Telecommunications‘data design _
| §41.1.22 Security evaluation and planning _
§ 4.1.4.23 Commissioning

§4.1.4.24 Sustainable Project Services pursuant to Section
4.13 |

§41.1.25 Fast-track design services _ |
§$41.1,.26 Multiplebidpackages

§4.1.1.27 Historic preservation

(§4.1.1.28 Furniture, furnishings, ; and ¢ J eguipmen ment design _

1 $44.1.30 Other Supplemental Services
PAGE 13

| §4.4.4.29 Other services provided by specialty Consultants :

As requested in RFP no tunher supplemental services anticipate at this time.
PAGE 75

| Two ( 2_}reviews of each Shop Drawing, Product Data item, sample and similar submittals of the
Contractor

3 Two t os ) ispections} ‘for any portion of the Work to ficfetihine whether such portion of the Work is
substantially complete in accordance with the requirements of the Contract Documents

4 Two (2) inspections for any portion of the Work to determine final completion.

§ 4.2.5 Ifthe services covered by this Agreement have not been completed within twelve (12) months of the date of
this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall be
compensated as Additional Services.

PAGE 16

§ 6.3 In preparing estimates of the Cost of Work, the Architect shall be permitted to include contingencies for design,
bidding, and price escalation; to determine what materials, equipment, component systems, and types of construction
are to be included in the Contract Documents; to recommend reasonable adjustments in the program and scope of the
Project; and to include design alternates as may be necessary to adjust the estimated Cost of the Work to meet the
Owner’s budget. The Architect's estimate of the Cost of the Work shall be based on current area, volume or similar
conceptual estimaling techniques. If the Owner requires a detailed estimate of the Cost of the Work, the Architect shall
provide such an estimate, ifidentified as the Architect’s responsibility in Section 4.1.1, as a Supplemental Service. All
construction estimates provided by CM,

PAGE 17

Additions and Deletions Report f. for AIA Document B101' ™ — 2047. Copyright © 1974, 1978, 1987, 1997. 2007 and. 2017 by The American institute of A of Architect Ss.
All rights reserved. WARNING This AIA*® Document is protected by U.S. Copyright Law and Internaiioral Treaties. Unauthorized rooinduction oF

distribution of this AIA” Document, ar any partron af it, may result in severe civil and ¢rimunai penalies, and wil be progcecided to the maxinuin exient
possible under the law. This document was produced by AIA software at 11:12:42 ET on 04/02/2019 under Order No.0100024863 which expires on 1243/2019,

and is nol for resale
User Notes: (1131096914)

Page Image
Finance Committee - Agenda - 5/15/2019 - P43

Footer menu

  • Contact