Equipment & Toois needed
e Large gang box
High Priority Box 2
e Customer needs to replace lower chain guide rails for lower section left and right Complete lower section both
sides
Equipment & Tools needed
Alt units
e Customer would like a PowerPoint training class on the units Class room and field training
e This is not Huber controls we have no history of anything being rest all has been cleared from the history
e | couldn’t find how long the timer was on the VFD for the overload settings customer needs to look into this
and move to .5sec.
e Customer has the unit to try to fix itself 3 times they need to move this to one time.
e The damage done here is because the customer has not done any tensioning of the chains. This could have
been prevented.
e Inaddition, the customer said someone had dumped logs down a manhole. Erwin brought up a point that they
may be able to get this covered under insurance due to this.
Equipment & Tools needed
Priotrity Items
e
Equipment & Tools needed
Open items Service Group Responsible
9
Additional Request from Customer, Engineer and/or Contractor i Responsible
o
Open items for Aftermarket Sales Rep. Responsible
Request for Parts & Service Quote.
e Please quote parts listed above
Lindsay Barnes & Mike
Suddreth & Josh Dobbs
3725 NorthCross Center Court | Sutte A] Huntersville | NC | 28072 | USA
Oitice (704) S49-1010 | Fax (704) 949-1020 | www. cuner-tecnnology.cam